Kamwokya Times
Advertisement
  • Home
  • News
  • Business
  • Health
  • Education
  • Entertainment
  • Politics
  • Opinion
  • Sports
  • Contact
No Result
View All Result
  • Home
  • News
  • Business
  • Health
  • Education
  • Entertainment
  • Politics
  • Opinion
  • Sports
  • Contact
No Result
View All Result
Kamwokya Times
No Result
View All Result
Home News

Rukungiri RDC Rejects UGX30.5M Dump Site Fence Over Poor Workmanship

Kamwokya Times by Kamwokya Times
July 14, 2026
in News
0 0
0
Rukungiri RDC Rejects UGX30.5M Dump Site Fence Over Poor Workmanship
Share on FacebookShare on X

The Deputy Resident District Commissioner (RDC) of Rukungiri, Wilberforce Ahimbisibwe Ongom, has refused to commission a newly constructed fence at the Ruhega Garbage Dumping Site, citing poor workmanship and failure to meet the required specifications.

During an inspection of the project on Tuesday, Ahimbisibwe said the contractor, ISHEBA Contractors Ltd, had failed to fence the entire government land, leaving part of it vulnerable to encroachment.

He also observed that the entrance gate was too narrow for easy access by vehicles and that several fence pillars had been erected on the garbage heap instead of being anchored on firm ground.

The inspection was attended by Rukungiri Municipal Town Clerk Isaiah Tumwesigye, Municipal Executive Engineer Eng. Merynah Kekiijo, Principal Health Officer Dr. Davis Ahabwe, Deputy Mayor Mark Sulait Turyamureba and other municipal officials.

The fencing project, awarded to ISHEBA Contractors Ltd during the last financial year, is valued at 30.57 million shillings.

The inspection team found sections of the chain-link fence to be weak and unstable, indicating that the support pillars had not been properly constructed.

Other InterestingArticles

Stalled World Bank funded projects to be fasttracked

Running to Museveni Fails to Save Ofwono Opondo as Gen Kainerugaba Registers His Readiness to Attend his Funeral in Mulanda

UPDF returns from Somalia; Semujju won’t eat his chicken

NWSC Unveils Six-Month Plan to Increase Water Supply Hours Across Kampala

Kampala’s Water Crisis in the Spotlight as NWSC Moves to Tackle Distribution Bottlenecks

NWSC Sets 60-Day Countdown as It Launches Six-Month Plan to End Kampala’s Persistent Water Supply Woes

Muhoozi Announces Plans to Step Down as Uganda’s Military Chief

What Kampala Water Customers Should Expect as NWSC Rolls Out Six-Month Improvement Plan

Ahimbisibwe directed the contractor to demolish and reconstruct the defective sections to the required standard before the project can be commissioned.

Municipal Town Engineer Isaiah Tumwesigye said the contractor has not yet been paid for the works and stressed that no payment will be made until the defects are rectified and the project is completed in accordance with the contract specifications-URN. Give us feedback on this story through our email: kamwokyatimes@gmail.com

Post Views: 164

Read RelatedArticles

Stalled World Bank funded projects to be fasttracked
News

Stalled World Bank funded projects to be fasttracked

November 6, 2026
5
Running to Museveni Fails to Save Ofwono Opondo as Gen Kainerugaba Registers His Readiness to Attend his Funeral in Mulanda
News

Running to Museveni Fails to Save Ofwono Opondo as Gen Kainerugaba Registers His Readiness to Attend his Funeral in Mulanda

November 6, 2026
87
UPDF returns from Somalia; Semujju won’t eat his chicken
News

UPDF returns from Somalia; Semujju won’t eat his chicken

November 6, 2026
32
NWSC Unveils Six-Month Plan to Increase Water Supply Hours Across Kampala
News

NWSC Unveils Six-Month Plan to Increase Water Supply Hours Across Kampala

November 6, 2026
8
Kampala’s Water Crisis in the Spotlight as NWSC Moves to Tackle Distribution Bottlenecks
News

Kampala’s Water Crisis in the Spotlight as NWSC Moves to Tackle Distribution Bottlenecks

November 6, 2026
6
NWSC Sets 60-Day Countdown as It Launches Six-Month Plan to End Kampala’s Persistent Water Supply Woes
News

NWSC Sets 60-Day Countdown as It Launches Six-Month Plan to End Kampala’s Persistent Water Supply Woes

November 6, 2026
5

Top Stories

Stalled World Bank funded projects to be fasttracked
News

Stalled World Bank funded projects to be fasttracked

by Kamwokya Times
November 6, 2026
0
5

Read more

Running to Museveni Fails to Save Ofwono Opondo as Gen Kainerugaba Registers His Readiness to Attend his Funeral in Mulanda

UPDF returns from Somalia; Semujju won’t eat his chicken

NWSC Unveils Six-Month Plan to Increase Water Supply Hours Across Kampala

Featured News

Stalled World Bank funded projects to be fasttracked
News

Stalled World Bank funded projects to be fasttracked

by Kamwokya Times
November 6, 2026
0
5

Read more

Running to Museveni Fails to Save Ofwono Opondo as Gen Kainerugaba Registers His Readiness to Attend his Funeral in Mulanda

UPDF returns from Somalia; Semujju won’t eat his chicken

NWSC Unveils Six-Month Plan to Increase Water Supply Hours Across Kampala

Kamwokya Times

Copyrights © 2024 All Rigts Reserved

  • Home
  • News
  • Business
  • Health
  • Education
  • Entertainment
  • Politics
  • Opinion
  • Sports
  • Contact

No Result
View All Result
  • Home
  • News
  • Business
  • Health
  • Education
  • Entertainment
  • Politics
  • Opinion
  • Sports
  • Contact

Copyrights © 2024 All Rigts Reserved

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In

Add New Playlist

error: Content is protected !!
Are you sure want to unlock this post?
Unlock left : 0
Are you sure want to cancel subscription?