By KT Reporter
The leadership of Mpondwe-Lubhiriha Town Council in Kasese District is seeking over 50 million shillings to complete drainage works on the newly upgraded one-and-a-half-kilometre road network in the town council. The Kasese District Senior Civil Engineer, Joachim Okello, blamed the project consultant for poorly costing the works, which he said created the funding gap.
He noted that the required funds are in addition to the two billion shillings already invested in the construction works. Okello added that the town council receives large volumes of waste from the surrounding mountainous areas, and without a proper drainage system, the road infrastructure could deteriorate within a short period.
However, the Town Council Physical Planner, Rogers Baluku, said some of the gaps are a result of the expiration of the Physical Development Plan (PDP), which affects detailed planning for infrastructure development. He added that recurring floods have exposed deeper challenges, including poor drainage systems and limited resources, which continue to undermine the town council’s road infrastructure.
Sylvester Mapozi, the LCIII Chairperson, said the town council and other stakeholders must mobilise resources to fix the drainage system, warning that the improved road could otherwise break down. He also blamed some wealthy individuals who have built structures in water channels, blocking natural drainage paths and contributing to the poor drainage.
Rodgers Muthahunga, the newly elected LCIII Chairperson for the town council, said there is an urgent need to update the Physical Development Plan to guide the area’s growth. He also called on technical officials to act responsibly when executing their duties, noting that such gaps would not arise if those responsible were doing their work effectively.
-URN. Give us feedback on this story through our email: kamwokyatimes@gmail.com







